Risk assessments & method statements

Control the real risks, not just the paperwork.

A useful assessment identifies who could be harmed and sets controls that match the site. The method statement then gives the team a workable sequence. Together they help turn legal duties into practical site arrangements.

What you receive

Clear documents built around the job.

  • A suitable, proportionate assessment of the significant hazards.
  • Controls following the hierarchy: eliminate first, then reduce and control.
  • A logical work sequence linked to the risk controls.
  • Health controls for silica, wood dust, noise, vibration and hazardous products where relevant.
  • Consideration of employees, subcontractors, visitors, neighbours and the public.

What we need from you

The facts are usually straightforward.

  • 01The activity, location, team size and expected duration.
  • 02Plant, access equipment, substances and materials involved.
  • 03Existing services, occupied areas and simultaneous work by others.
  • 04Competence, supervision, emergency arrangements and any client rules.

From enquiry to working document

Once you know the job, we can ask the right questions.

01

You describe the work

For cutting concrete blocks, tell us where the work happens, the cutting method, duration, equipment, nearby people and available water or extraction.

02

We turn facts into controls

We specify practical dust prevention and control, suitable equipment, exclusion, housekeeping, RPE requirements and supervision instead of relying on a generic ‘wear a mask’ instruction.

03

You put it into practice

The team is briefed in plain language, the controls are available before cutting begins, and the supervisor checks that the method remains workable as conditions change.

Why proper planning matters

Moral

Prevent a worker, neighbour, visitor or family from being injured—or developing an occupational disease years after the work.

Legal

Employers and construction dutyholders must assess risk and plan, manage and monitor work. Companies and individuals can face enforcement and prosecution.

Financial

Poor control can bring delay, rework, lost contracts, higher insurance costs, HSE fees, fines, legal costs and compensation claims.

Criminal enforcement and private liability are separate exposures.

HSE may investigate, serve notices or prosecute. Separately, an injured worker or member of the public may pursue a civil claim for compensation. A document helps only when it reflects the job and its controls are actually provided and used.

HSE enforcement reality

Planning failures can become prosecutions.

These are official HSE case summaries. Fines are imposed by the courts; HSE does not set or collect them.

£650k + £40k costs

Basic excavation controls were absent

A worker died in an unsupported trench with spoil placed beside the edge. In September 2026, two companies and an individual were sentenced; the principal contractor was also fined £500,000.

Read the HSE case

Long-term harm

Silica is a major construction health risk

HSE identifies respirable crystalline silica as the biggest risk to construction workers after asbestos. Heavy or prolonged exposure can cause lung cancer and other serious respiratory disease.

Read HSE’s silica guidance

£188/hr

HSE Fee for Intervention

When HSE finds a material breach, the dutyholder can be charged for the visit, investigation, reports and time spent helping put matters right. The published rate from 1 April 2026 is £188 per hour.

Check HSE’s current rate